DASCO were invited to a competitive tender to price for the superstructure build of a PSP building at Ravensthorpe, part of W3 Transpennine Route Upgrade West
The scope of works was to carry out the brick/block work including all vents/fan opening, supply and installation of doors, drainage as well as construction and design input for the proposed roof structure.
We included costings for all necessary supervision, labour, plant, permanent materials, temporary materials, design, and consumables to carry out the construction of the PSP superstructure as specified within the drawings and design information provided by the client.
Having been successful in our tender, the Ravensthorpe railway project for the Transpennine Route Upgrade west of Leeds was delivered on time and without issues.
From start to finish our works were completed to specification. Meeting our own high standards in under 7 days.