DASCO were invited to a competitive tender to price for a complete office refurbishment as part of the Transpennine Route Upgrade.

Client

Network Rail

Project:

Batley Hub

Date:

Oct 22 - Mar 23

Brief:

The client required a minimum of 100 desk space, a mission control room and 18 conference suites, along with a passenger lift, disabled toilet on the first floor and a kitchen/communal area.

Both the ground floor and 1st floor male / female toilets were fully refurbished as part of the project.

Our Approach

This project started as full strip out of the existing dilapidated office space and completed with a beautiful high tech re-fit and full decoration.

The team really got their hands dirty and from start to finish our works were completed on time to specification and to the complete satisfaction of the client .

What we did

We always take pride in producing a first-class quality job every time. Here are just a few of the things our skilled team carried out as part of this project.

Partition Walls

Ventilation

Penetration Sealing

Flooring

Electrical Works

Internal Decorating

Supply Fire Doors

Fire Door Installations